EGY Petroleum Calibration
Calibration system for 450,000 tons/day of petroleum products. Delivered in 2018.
From 2012 to 2024, I built 6 real production systems. Names protected by NDA — numbers are real.
6 real systems built and deployed in the field. Names protected by NDA — but the numbers are real.
Calibration system for 450,000 tons/day of petroleum products. Delivered in 2018.
Microwave network for 10,000+ employees. 99.99% uptime. 4 sites.
Pipeline leak detection via fiber optics. Distributed sensing. Real-time alerts.
Republic-scale SCADA system. Yokogawa DCS. Thousands of I/O points.
Data extraction from complex documents. 400M tokens. 90+ models.
Authentic Arabic story generation. 11+ stories. Cultural context respected.
A real Adam case studies list is in preparation. Expected release: Q3 2026. Until then, the 6 systems shown are proof of capability — built in the field, running in production, names protected by NDA contracts.
For reference inquiries, contact [email protected].